Meta
Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données
Entry LevelOn-site
Location
Vancouver, British Columbia, Canada
Salary
Not listed
Experience
Not specified
Posted
Today
Job Description
{"title": "Connectivity Engineer - Data Center Construction | Ing\u00e9nieur en connectivit\u00e9 - Construction de centres de donn\u00e9es", "description": "{\"__html\":\"\\u003Cspan>Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta \\u2019s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta \\u2019s server banks.\\n\\nThe DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.\\n\\n-------\\n\\nMeta recherche un ing\\u00e9nieur en connectivit\\u00e9 pour rejoindre l\\u2019\\u00e9quipe de conception, d'ing\\u00e9nierie et de construction (DEC). Nos centres de donn\\u00e9es constituent le socle sur lequel reposent nos services et notre infrastructure en pleine expansion. L'\\u00e9quipe assure le bon fonctionnement des centres de donn\\u00e9es mondiaux de Meta, en fournissant l'infrastructure physique qui relie le monde aux vid\\u00e9os, aux flux et aux autres informations stock\\u00e9es sur les parcs de serveurs de Meta.\\n\\nL\\u2019ing\\u00e9nieur en connectivit\\u00e9 de DEC fournira un soutien sur site afin de garantir que les projets de t\\u00e9l\\u00e9communications de DEC soient ex\\u00e9cut\\u00e9s dans les d\\u00e9lais impartis, dans le respect du budget et au niveau de qualit\\u00e9 sp\\u00e9cifi\\u00e9. L'ing\\u00e9nieur en connectivit\\u00e9 sera l'interlocuteur privil\\u00e9gi\\u00e9 pour la gestion de l'ensemble du cycle de vie du projet, depuis son lancement jusqu'\\u00e0 la mise en service et le transfert aux op\\u00e9rations. L\\u2019ing\\u00e9nieur en connectivit\\u00e9 de DEC collabore \\u00e9troitement avec des partenaires interfonctionnels au si\\u00e8ge du centre de donn\\u00e9es, notre sous-traitant sur site et d\\u2019autres centres de donn\\u00e9es dans le monde entier.\\u003C\\/span>\"}", "minimum_qualifications": ["Experience engaging and guiding stakeholders | Exp\u00e9rience en mobilisation et orientation des parties prenantes", "Experience with MS Office (Word, Excel, and PowerPoint) and MS Project | Exp\u00e9rience avec MS Office (Word, Excel et PowerPoint) et MS Project", "7+ years experience in project management | Plus de 7\u00a0ans d\u2019exp\u00e9rience en gestion de projet", "Experience providing solutions to construction related problems | Exp\u00e9rience dans la fourniture de solutions aux probl\u00e8mes li\u00e9s \u00e0 la construction"], "preferred_qualifications": ["Experience with Primavera 6 | Exp\u00e9rience avec Primavera 6", "Experience reviewing and leading installations to design documents and specifications | Exp\u00e9rience dans la supervision et la direction d\u2019installations selon les documents et sp\u00e9cifications de conception", "Experience with fiber optic testing at scale inclusive of complex troubleshooting | Exp\u00e9rience en mati\u00e8re de tests de la fibre optique \u00e0 grande \u00e9chelle, y compris le d\u00e9pannage complexe", "Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements) | Capacit\u00e9 av\u00e9r\u00e9e \u00e0 int\u00e9grer des outils d'IA afin d'optimiser/de red\u00e9finir les flux de travail et de g\u00e9n\u00e9rer des r\u00e9sultats consid\u00e9rables (par exemple, gains d'efficacit\u00e9, am\u00e9lioration de la qualit\u00e9)", "Data center development and/or construction management experience | Exp\u00e9rience en d\u00e9veloppement et/ou en gestion de la construction de centres de donn\u00e9es", "Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews) | Exp\u00e9rience en mati\u00e8re de respect et de mise en \u0153uvre de pratiques d\u2019IA responsables et \u00e9thiques (par exemple, \u00e9valuation des risques, att\u00e9nuation des biais, contr\u00f4les de qualit\u00e9 et d\u2019exactitude)", "Experience managing IT or IP Network deployment projects in a mission critical environment requiring coordination across multiple disciplines for the delivery of a common goal | Exp\u00e9rience dans la gestion de projets de d\u00e9ploiement de r\u00e9seaux informatiques ou IP dans un environnement critique n\u00e9cessitant une coordination entre plusieurs disciplines pour atteindre un objectif commun", "Experience with Quality Assurance and Quality Control, including progressive inspections and acceptance | Exp\u00e9rience en assurance qualit\u00e9 et contr\u00f4le qualit\u00e9, y compris les inspections progressives et l\u2019acceptation", "Experience in leading deployments of Network/Structure cabling infrastructure | Exp\u00e9rience dans la direction de d\u00e9ploiements d\u2019infrastructures de c\u00e2blage r\u00e9seau et structur\u00e9", "Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies | Une volont\u00e9 manifeste de perfectionner en permanence ses comp\u00e9tences en IA (par exemple, ing\u00e9nierie des invites et du contexte, orchestration d'agents) et de se tenir inform\u00e9 des derni\u00e8res avanc\u00e9es en mati\u00e8re de technologies d'IA", "Experience with outside plant cabling (OSP) deployments including OTDR/OLTS testing | Exp\u00e9rience des d\u00e9ploiements de c\u00e2blage ext\u00e9rieur (DCE), y compris les tests OTDR/OLTS", "Demonstrated ability to integrate AI tools to optimize/redesign workflows and drive measurable impact (e.g., efficiency gains, quality improvements)", "Experience adhering to and implementing responsible, ethical AI practices (e.g., risk assessment, bias mitigation, quality and accuracy reviews)", "Demonstrated ongoing AI skill development (e.g., prompt/context engineering, agent orchestration) and staying current with emerging AI technologies"], "responsibilities": ["Project Planning & Control - Create, maintain, and report on site project and program scope, schedules and milestones. Work closely with site project management team throughout the project lifecycle from the creation of project and program plans through project close out | Planification et suivi de projet : d\u00e9finir, mettre \u00e0 jour et rendre compte de la port\u00e9e, des calendriers et des \u00e9tapes cl\u00e9s des projets et programmes sur site. Travailler en \u00e9troite collaboration avec l\u2019\u00e9quipe de gestion de projet du site tout au long du cycle de vie du projet, de la cr\u00e9ation des plans de projet et de programme jusqu\u2019\u00e0 la cl\u00f4ture du projet.", "Learnings - Continually review ongoing projects for efficiencies in schedule, budget, and opportunities to enable cross-functional partners to be successful. Document data points to assist with field coordination of projects. Support development of project management best practices and initiatives, coordinating SOPs/SIPs with vendors, and participating in global and regional standards. Coordinate lessons learned with the internal and external cross functional partners | Enseignements tir\u00e9s : examiner en permanence les projets en cours afin d'optimiser les d\u00e9lais et le budget, et d'identifier les opportunit\u00e9s permettant aux partenaires interfonctionnels de mener \u00e0 bien leurs missions. Documenter les points de donn\u00e9es pour faciliter la coordination des projets sur le terrain. Soutenir le d\u00e9veloppement des meilleures pratiques et des initiatives en mati\u00e8re de gestion de projet, en assurant la coordination des proc\u00e9dures op\u00e9rationnelles standard (POS) et des plans d'ex\u00e9cution (PDE) avec les fournisseurs, et en participant \u00e0 l'\u00e9laboration de normes mondiales et r\u00e9gionales. Coordonner les enseignements tir\u00e9s avec les partenaires interfonctionnels internes et externes", "Forecasting - Support project controls team with forecasting and budget efforts as required. Share current project status with upstream and downstream partners, ensuring crisp and complete handoffs between teams | Pr\u00e9visions \u2013 Apporter un soutien \u00e0 l\u2019\u00e9quipe de contr\u00f4le de projet en mati\u00e8re de pr\u00e9visions et de budget, selon les besoins. Partager l'\u00e9tat d'avancement actuel du projet avec les partenaires en amont et en aval, afin de garantir des transferts clairs et complets entre les \u00e9quipes.", "Technical Reviews - Establish milestones for equipment purchase and track and report against these milestones Assist with the selection and review of a contractor to support the structured cabling work within a data center | \u00c9valuations techniques : d\u00e9finir des \u00e9tapes cl\u00e9s pour l'achat d'\u00e9quipements, assurer leur suivi et rendre compte de leur avancement ; participer \u00e0 la s\u00e9lection et \u00e0 l'\u00e9valuation d'un prestataire charg\u00e9 des travaux de c\u00e2blage structur\u00e9 au sein d'un centre de donn\u00e9es.", "Metrics - Report progress and risks on site projects and other initiatives to key stakeholders | Indicateurs \u2013 Rendre compte des progr\u00e8s et des risques li\u00e9s aux projets sur site et autres initiatives aux principales parties prenantes", "Workflow - Work with installation partners to establish and track milestones. Conduct pre-project planning, project handoffs, and ensure design delivery and verification. Identify and respond to project risks and high-priority issues rapidly and effectively through effective action and appropriate escalation. Track and manage project change order requests | Processus de travail : collaborer avec les partenaires d\u2019installation pour \u00e9tablir et suivre les jalons. Effectuer la planification pr\u00e9liminaire du projet, la passation de projet et assurer la livraison et la v\u00e9rification de la conception. Identifier les risques li\u00e9s au projet et les probl\u00e8mes hautement prioritaires, et y r\u00e9pondre rapidement et efficacement gr\u00e2ce \u00e0 des mesures concr\u00e8tes et \u00e0 une remont\u00e9e hi\u00e9rarchique appropri\u00e9e. Suivre et g\u00e9rer les demandes d'ordre de modification de projet.", "Vendor Field Management - Responsible for all connectivity activities within construction, projects on site including tracking and reporting actual progress related to schedule expectations. Set and communicate clear expectations together with the immediate site team, build key relationships with our installation partners, foster a safe, collaborative working environment and execute a goal of \u2018right first time.\u2019 | Gestion des prestataires sur le terrain : charg\u00e9 de toutes les activit\u00e9s li\u00e9es \u00e0 la connectivit\u00e9 dans le cadre des travaux de construction et des projets sur site, y compris le suivi et le compte rendu de l'avancement r\u00e9el par rapport au calendrier pr\u00e9vu. D\u00e9finir et communiquer des attentes claires en collaboration avec l'\u00e9quipe de chantier, \u00e9tablir des relations solides avec nos partenaires d'installation, favoriser un environnement de travail s\u00fbr et collaboratif, et mettre en \u0153uvre notre principe \u00ab bien faire du premier coup \u00bb.", "Quality Assurance - Perform physical inspections to ensure vendor work meets DEC quality standards throughout the lifecycle of the data center. Validate physical installs, test reports, build accuracy, material and local code compliance including constructability reviews on multiple design phases | Assurance qualit\u00e9 - Effectuer des inspections physiques pour s\u2019assurer que le travail du fournisseur respecte les normes de qualit\u00e9 DEC tout au long du cycle de vie du centre de donn\u00e9es. Valider les installations physiques, les rapports d\u2019essais, l\u2019exactitude de la construction, la conformit\u00e9 des mat\u00e9riaux et des codes locaux, y compris les analyses de constructibilit\u00e9 lors de plusieurs phases de conception.", "Technical Field Lead - Technical lead for industry and Meta standards, responsible to lead product evaluation, design, and installation methods in the field including scope clarification, design and installation details as the owner of the Request for Information process | Responsable technique sur le terrain : responsable technique des normes industrielles et de Meta, charg\u00e9 de diriger l\u2019\u00e9valuation des produits, la conception et les m\u00e9thodes d\u2019installation sur le terrain, y compris la clarification du p\u00e9rim\u00e8tre, les d\u00e9tails de conception et d\u2019installation, en tant que responsable du processus de demande de renseignements.", "Technical Coordination - Develop solutions to in-field scope-gap or clash issues. Partner with DEC design and engineering teams to digitally support design reviews, BOM reviews, and as-built drawing validations | Coordination technique : \u00e9laborer des solutions aux probl\u00e8mes de lacunes ou de conflits de p\u00e9rim\u00e8tre sur le terrain. Collaborer avec les \u00e9quipes de conception et d'ing\u00e9nierie de DEC pour faciliter num\u00e9riquement les revues de conception, les revues de nomenclatures et la validation des plans de mise en \u0153uvre.", "Communications & Cross functional team engagement - Liaise with construction partners to ensure deliverables are met during new builds and retrofits. Coordinate with logistics partners, vendors, and suppliers to ensure a smooth end to end flow of materials as needed. Work closely with the relevant teams to proactively communicate progress and project risks and initiatives to key stakeholders | Communication et collaboration interfonctionnelle - Assurer la liaison avec les partenaires de construction pour garantir le respect des livrables lors des nouvelles constructions et des r\u00e9novations. Coordonner avec les partenaires logistiques, les vendeurs et les fournisseurs afin d\u2019assurer un flux de mat\u00e9riaux fluide de bout en bout, selon les besoins. Collaborer \u00e9troitement avec les \u00e9quipes concern\u00e9es afin de communiquer de mani\u00e8re proactive les progr\u00e8s, les risques et les initiatives li\u00e9s aux projets aux principales parties prenantes.", "Safety - Ensure that vendors adhere to safety obligations in accordance with local regulations and DEC Safety best practices. Lead a 'safety first' experience while working with others, in support of shared goals. Foster an environment of open and transparent communication while acknowledging demonstrated experience in EHS practices | S\u00e9curit\u00e9 : s\u2019assurer que les entrepreneurs respectent leurs obligations en mati\u00e8re de s\u00e9curit\u00e9 conform\u00e9ment \u00e0 la r\u00e9glementation locale et aux meilleures pratiques de s\u00e9curit\u00e9 de DEC. Mener une exp\u00e9rience \u00ab la s\u00e9curit\u00e9 d'abord \u00bb tout en collaborant avec les autres, afin de soutenir des objectifs communs. Favoriser un environnement de communication ouverte et transparente tout en reconnaissant l\u2019exp\u00e9rience d\u00e9montr\u00e9e en mati\u00e8re de pratiques EHS"], "locations": ["Vancouver, Canada"], "departments": ["Data Center"], "public_compensation": [{"error_apology_note": "", "has_bonus": true, "has_equity": true, "compensation_amount_minimum": "CA$104,000/year", "compensation_amount_maximum": "CA$142,000/year"}]}